Operating Curve Change Feasibility Analysis Phase 1 Report (4.44 MB)
Operating Curve Change Feasibility Analysis Phase 2 Report (June 2022) (16.4 MB)
Downstream Release Alternatives Phase 1 Report (2.21 MB)
Downstream Release Alternatives Phase 2 Report (June 2022) (5.42 MB)
Battery Energy Storage System (BESS) Report (2.48 MB)
Erosion and Sedimentation Study Report (83.9 MB)
Water Quality Study Report (7.4 MB)
Threatened and Endangered Species Study Report (47.3 MB)
Aquatic Resources Study Report (19.3 MB)
Downstream Aquatic Habitat Study Report (7.48 MB)
Phase 1 Project Lands Evaluation Study Report (66 MB)
A Botanical Inventory of a 35-Acre Parcel at Flat Rock Park, Blake’s Ferry, Alabama (697 KB)
Recreation Evaluation Report (49 MB)